Signing the lease on a new commercial space feels like the finish line, but it is really the start of a second project. Between the handover of keys and the day your team walks in, the premises has to be inspected, repaired, wired, cleaned and laid out so the business can trade from day one. Leave those jobs until moving week and you risk staff working around tradespeople, deliveries with nowhere to go and a slow, expensive first month.
The good news is that most of the problems are predictable. If you treat the new site as a building project in its own right, with its own checklist and timeline, the move itself becomes far simpler.
Start with a proper condition inspection
Before you plan a single desk position, walk the premises with a notepad, a camera and, ideally, a maintenance professional. You are looking for two things: defects that need fixing before anyone moves in, and existing damage you need on record so it is not blamed on you when the lease ends.
- Floors: lifting tiles, worn carpet, soft spots in timber and cracked slabs near loading areas.
- Plumbing: slow drains, dripping taps, water stains on ceilings and the age of the hot water system.
- Electrical: enough power points in the right places, tripping circuits, emergency and exit lighting that works.
- Doors and security: locks, door closers, roller doors and alarm panels.
- Exterior: gutters, signage fixings, car park line marking and landscaping that is overgrown or blocking paths.
Photograph everything with the date visible and send a copy to the landlord or agent. A dated condition report is one of the cheapest forms of protection a tenant has.
Check the work environment against your obligations
A new premises is also a new workplace, and employers carry duties for it from the first day staff arrive. Safe Work Australia's model code of practice for managing the work environment and facilities covers workspaces, lighting and ventilation, along with amenities such as toilets, drinking water and dining areas. Use it as a practical checklist when you assess the space.
Pay particular attention to entry and exit routes, the number and condition of bathrooms for your headcount, kitchen and break areas, and whether lighting suits the work being done. These items are much easier to correct while the premises is empty than once furniture and people are in place.
Book the repairs and fit-out in the right order
Once you have a defect list, sequence the work so trades are not undoing each other. A typical order looks like this:
- Structural and building repairs, including walls, ceilings, doors and any carpentry.
- Electrical and data rough-in while walls and ceilings are still open.
- Plumbing changes for kitchens, bathrooms and any new sinks or equipment.
- Painting and decorating.
- Floor restoration or new floor coverings, done last so they are not damaged.
- A final clean and pest treatment before furniture arrives.
Getting floors done last is the step most businesses skip, and it is usually the one they regret. Sanded timber or fresh carpet will not survive ladders, paint tins and tool trolleys.
Sort out connectivity early
Internet and phones are the services most likely to hold up a move. nbn recommends starting relocation plans two to three months ahead and checking which nbn technology is available at the new address. If you are removing walls or changing the layout, ask your provider whether existing nbn equipment needs to move or whether a registered cabler is required.
Map out where workstations, printers, wireless access points and any server or comms cabinet will sit, then have data points installed to match. It is far cheaper to run cabling during the fit-out than to retrofit it after the furniture is in.
Plan the physical move alongside the building work
Your move date should be set by the fit-out schedule, not the other way around. Build in a buffer of at least a few days between the final clean and the first truck arriving, because trades often run late and inspections can uncover last-minute fixes.
When you are planning a business relocation, bring your removalist into the conversation while the building work is still underway. A good moving team will want to know about loading dock bookings, lift dimensions, access hours and any stairs or long carries at both sites, and they can help you decide what should be packed by staff and what needs professional handling. Sharing your new floor plan with them early means furniture can be labelled by room or team and placed correctly on the day.
If the new space will not be ready when the old lease ends, talk to your mover about short-term storage rather than squeezing into a half-finished building. Moving twice is frustrating, but working around wet paint and live electrical work is worse.
Do a final walkthrough before moving day
A day or two before the move, walk the premises again with your original defect list and tick off every item. Test lights, power points, taps, door locks and the alarm. Confirm the internet service is active and that someone has the keys, codes and fobs ready for the moving crew.
It also pays to confirm your plans still match where the business is heading. business.gov.au notes that common reasons for changing business premises include needing more space as the business grows, so leave some room in the layout for the next stage rather than filling every corner on day one.
A smoother start in the new space
Preparing a commercial premises properly takes a few extra weeks of planning, but it pays off in the first month of trading. Inspect early, fix defects in a sensible order, line up connectivity well ahead and coordinate the move around the building work. Your team arrives to a space that works, and you start your new lease without a list of problems waiting for you.